Opening a new bakery in an existing building requires a change use permit. For assistance, Lisa turned to Bannon Engineering for help for change use permitting assistance and engineering support to open the new bakery and cafe. The project involved estimating water and waste water usage, preparing a site plan showing where the utilities enter and exit the building, determining whether the sewer and water pipes were sized for the intended use.
DVTA Public Transportation Facility
Deerfield Valley Transit Association is a public transit facility located in Wilmington, VT. DVTA hired Bannon Engineering to scope and engineer a new location to construct a 16,000-sf maintenance garage, administration, and fleet parking complex.
West Hill Road
West Hill Road ‘grew up’ from an old logging road into a popular ‘back way’ to Sugarbush Ski Resort.. The original logging trail was cut into the side of the mountain leaving a steep drop off into the brook below.
Craft Beer Brewing – Wastewater Treatment
Rock Art Brewery does craft beer brewing in Morrisville, Vermont. It began production in 1997 in the Johnson, Vermont by founder Matt Nadeau. In 2009, Matt called Bannon Engineering to help him design a new state of the craft beer